load prediction造句
例句與造句
- Load predictions for district heating systems based on a wnn model
基于小波網(wǎng)模型的區(qū)域供熱系統(tǒng)負荷預測 - Research on load prediction model of air condition system based on elman neural network
型神經(jīng)網(wǎng)絡的空調(diào)負荷預測模型 - Thermal load prediction for heating systems based on wavelet and neural network
基于雙層規(guī)劃模型的電梯交通系統(tǒng)群組優(yōu)化 - So , the research of hourly meteorological parameters and cooling load prediction is a must
因此,必須進行逐時室外氣象參數(shù)和冷負荷的預測研究。 - Experiment stated clearly that two loading prediction by means of this calculation model was quite reasonable
實驗研究表明,在二級加載下該計算模型的預測結果是相當令人滿意的。 - It's difficult to find load prediction in a sentence. 用load prediction造句挺難的
- Then , mre reaches 3 . 21 % for workday and 5 . 96 % for holiday . a unique next 24 hours hourly cooling load prediction ann model is established
對工作日負荷預測,其平均預測誤差是3 . 21 ;對假日負荷,其平均預測誤差是5 . 96 。 - At present , the practical control of ice storage based on the correction of load prediction and off - line optimization is not seen in literature
迄今為止,國內(nèi)外有關文獻中,尚未見到關于冰蓄冷系統(tǒng)基于預測和離線憂化結果在線修汀來指導實際控制的文章。 - The result of cooling load prediction is true , believable and satisfying . the prediction precision of ann network is almost the same with that of the others introduced in foreign documents
預測結果正確、可信,并取得了令人滿意的效果,其預測準確度與國外同類方法基本持平。 - 6 . since the error in both the meteorological parameters and cooling load prediction is unavoidable , the online correction of prediction and offline optimization results is needed
無論是氣象參數(shù)預測,還是冷負荷的預測總難免出現(xiàn)偏差,這就需要對短期預測和離線優(yōu)化結果進行在線修正。 - Mae of hourly load prediction reduced to 65 . 07kwh and eep reduced to 2 . 60 % . this kind of model has not been reported by literature . a cost - minimum model for ice storage system is established and numerical calculation is carried out
建立了空調(diào)逐時負荷的24小時提前預測多點輸出動態(tài)模型,更進一步提高了負荷預測的精度,使得逐時負荷預測平均絕對誤差降低到了65 . 07kwh ,期望相對誤差降低到了2 . 60 。 - The essay combines the power system prediction , mathematical build modular technology and computer technology together and thoroughly and systematically makes an analysis , thus the software functions designed can meet the needs of power system load prediction
論文將電力系統(tǒng)負荷預測分析、數(shù)學建模技術、計算機技術有機結合,進行了深入、系統(tǒng)地分析。所設計的軟件功能較好地滿足了電力系統(tǒng)負荷預測的需求。 - This software includes five modules , i . e . the module of processing and importing historic data , load prediction model storehouse module , various types of load - predict module , prediction results outputting module , and the module of comparing between gas - storage ability and peak - shaving facility
該軟件包括歷史數(shù)據(jù)處理及輸入模塊、負荷預測模型庫模塊、各類型負荷預測模塊、預測結果數(shù)據(jù)庫輸出模塊、調(diào)峰負荷與儲氣匹配比較等5個模塊。 - Firstly , the paper introduces the cluster technology , load balancing technology and ejb component . secondly , the paper analyzes the architecture of ejb container clustering , studying the existed design methods of ejb cluster and their load balancing policy . upon their shortages of design methods and load policy , we offer a new design method of ejb cluster system by the proxy , and the pattern which effectively combines the load prediction with load balancing algorithm
本文首先介紹了集群技術、負載均衡技術、 ejb組件框架,然后分析了ejb容器集群體系結構,研究了常用系統(tǒng)設計方法及負載均衡策略,根據(jù)現(xiàn)有系統(tǒng)的不足,提出了基于軟件proxy的ejb容器集群總體框架,以及將負載預測與負載均衡技術相結合的思想。 - It includes : solving " excess attempt " and " defective attempt " of agc by load prediction in extraordinary shot time , that is preceding control technique ; ( 2 ) enhancing the regulating capacity and speed of agc of chongqing network by 5 measure ; analyzing the policymaking that chongqing network could achieve criterion now or after three gorges power station running , discussing the managing measure how to enhance regulating capability of agc of chongqing network
其中包括:利用超短期負荷預報解決agc “過調(diào)”和“欠調(diào)”問題的超前控制技術;以5種實現(xiàn)方式提高重慶電網(wǎng)agc可調(diào)量和調(diào)節(jié)速度;探討了當前和在三峽電站投運后重慶電網(wǎng)達到考核標準的對策,討論了從管理上提高重慶電網(wǎng)agc調(diào)節(jié)性能的辦法和措施。 - By incorporating the power sources location and load prediction results in the energy utilizing proposal , a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made , the result of which indicates that , it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together
并結合區(qū)內(nèi)電源點分布和負荷預測結果,進行了各縣三個五年計劃期間的電力電量平衡。得到了相應的結論。基于對風能、光能和水能資源開發(fā)各自特點的分析,文中進一步對多能互補系統(tǒng)進行了較深入的研究,明確了在阿里地區(qū)特定的自然條件下,采用風光互補抽水蓄能開發(fā)方式的合理性及可行性。
更多例句: 下一頁